Category : Guides

The supplier InLine Ovals has a readymade frame product which is entered in the Products File. You can import all of their product line, or update the pricing by doing the following: 1) Download the file from this site: http://www.frameready.ca/file/public/ 2) Select the correct file. CAN for Canadian and USA for American. the file extension .fmp12 ..

Read more

There are two ways to enter fabric hand-wrapped matboard onto a work order but it depends on how you have priced the substrate. If you always use the same substrate, then look at option B. However, if the substrate varies with different frame jobs, then you need to price the substrate based on the the ..

Read more

This report provides a list which can be sent to the vendor as PDF to order your supplies or used in-house.  This is the simplest way to create your vendor shopping list. HOW TO PRINT: Main Menu > Create Frame Order. Select range of dates in either Work Order Date or Due Date or leave ..

Read more

On the Work Order, the Priority field shows the status of the frame job. When a new work order is created, the Normal priority is the default and is automatically entered. Other options which can be selected are: Rush, Promised and Back Ordered. These selections do not affect the price of the order. If you wish to ..

Read more