The Problem
The Work Order sidebar button that reads “Select for Frame Order” now reads “N/A” – how can I add it to the Frame Order?
The Solution
This means the work order is on Hold or is an Estimate. Therefore the materials required for this order will not be added to the Create Frame Order. Change the status of the Work Order.