In this Article: Show
When adding fillets to a Work Order you can easily prevent the fillet from covering too much of the artwork.
This method is when your fillet is in the frame, as a layered or stacked frame.*
In the Work Order, click the layered
frame icon.
The Work Order Details window appears.
In the Layered Frames
tab, in the Frame1 column
(far right), type the fillet item number into the Moulding
field.
Fillet information auto-fills.
Still in the Frame1
column, click the Modify button.
The Price Code Item window appears.
Note: Changes made in this screen are saved in the Price Codes file, are applied to the current Work Order AND all future orders that use this fillet.
Adjust the Width size to match the sight-size of the fillet.
In the Lip field, either leave it blank or enter 0 (zero) to achieve the desired results.
In the Group field, confirm that the group is Fillet.
Click Done.
*If your fillet is being placed in a mat, then use the Fillet field to perform the size modification.
See also: How to Price Multiple Openings with Fillets