On the Work Order, the Priority field shows the status of the frame job. When a new work order is created, the Normal priority is the default and is automatically entered. Other options which can be selected are: Rush, Promised and Back Ordered. These selections do not affect the price of the order. If you wish to ..
Tag : production tools
Increase production and save time by listing all items to be pulled and cut in preparation for..
This is the second grey button in a column down the left side of work order screen. This button can also be found on the Main Menu screen in the salmon-colored block for Wo..
You can print a cut list for matboard with all dimensions, openings, reveals, totals and quantity ..
Track materials for specific orders. Then you will know when all the materials have arrived in order for workÂ..
This document will improve production flow in your back room or manufacturing facility. It lists all incomplete work orders, omitting any ‘estimates’ and orders ‘on hold’ with handy ch..
Download Article in PDF Format What do you need for smooth production?  Save time by using FrameReady’s built-in tools designed to help you run an effective system for keeping track of orders and having what you need to complete the..
It’s easy to group work orders from different time periods together onto one invoice or one proposal. The answer is to use the Job# field on the work order. It acts like a paper clip which grabs a group of work orders and joins them together using a number. FrameReady will automatically group together all ..